MYRO Tested for Modular Efficiency at LINQ Factory

Dubai, UAE
June 2025

At the LINQ Modular in Dubai, MYRO underwent a trial in June 2025, showcasing its capability to integrate into offsite modular construction factory workflows. Painting 120 sqm at 125 sqm/hr with 11 sqm/L efficiency, MYRO proved ideal for scalable, precision-driven modular production.

MYRO Tested for Modular Efficiency at LINQ Factory

In June 2025, MYRO was deployed at the LINQ Modular offsite construction facility in Dubai to evaluate its performance within a controlled, factory-based modular construction setup. The trial focused on validating MYRO’s ability to deliver consistent paint quality, rapid output, and smooth adaptability in a high-efficiency production environment.

Spanning a total paintable area of 120 square metres, the test provided valuable insight into how robotic painting can be seamlessly integrated into offsite workflows-where speed, precision, and repeatability are critical. The deployment aimed to assess MYRO’s capabilities under factory conditions, ensuring alignment with the industry's push toward automation in modular building systems.

MYRO was up and running within 20 minutes of setup, quickly establishing itself as a productivity asset. During the test, the robot achieved a painting rate of 125 square meters per hour, while maintaining a paint consumption rate of 11 sqm per litre-highlighting not only efficiency but also economical use of material.

Operational Results:

  • Test Duration: 2 days
  • Total Area Painted: 120 sqm
  • Setup Time: 20 minutes
  • Productivity: 125 sqm/hour
  • Paint Consumption Rate: 11 sqm/L

The project reaffirmed MYRO’s strength in delivering superior paint application while reducing dependency on manual labor. Its ability to maintain high standards across modular units contributes directly to improved quality assurance and faster production cycles in offsite construction environments.

This test at the LINQ Factory marked another important step in MYRO’s journey toward redefining how modern construction is executed. Collaborating with forward-looking partners like LINQ Modular helps MYRO push the boundaries of what’s possible in construction automation.

Glimpses of the Project:

Glimpse 1
Glimpse 2
Glimpse 3
Glimpse 4
Glimpse 5
Glimpse 6
Glimpse 7
Glimpse 8
Glimpse 9
Company Logo

Singapore Headquarters

111 North Bridge Road
#07-11 Peninsula Plaza Singapore (179098)

Dubai Branch

7, 599- Jebel Ali Industrial First
Dubai, UAE- 507187

Contact Number: +971 54 995 4416
Email [email protected]


© All Rights Reserved MYRO International PTE 2026