MYRO Field-Tested at A.Yoshii Headquarters

Londrina, PR, Brazil
August 2022

At A.Yoshii Headquarters in Brazil, MYRO painted 134 sqm at 270 sqm/h, using just 1L per 16 sqm. The project validated MYRO’s efficiency in terms of productivity and material use, thereby strengthening its position as an innovative solution for construction automation.

MYRO Field-Tested at A.Yoshii Headquarters

MYRO was deployed at A.Yoshii Headquarters in Londrina for a test, aiming to evaluate its effectiveness in a real-world construction setting. The deployment focused on benchmarking MYRO’s speed, paint consumption, and overall efficiency when compared to traditional manual painting methods.

High Throughput and Material Efficiency Demonstrated

  • Covered 134 square meters during the demo
  • Achieved peak productivity of 270 sqm/h
  • Positioned as a high-performance alternative to manual labour
  • Optimised paint usage with a rate of 16 sqm/L
  • Maintained excellent coverage quality with minimal material consumption

This pilot was designed to test how seamlessly MYRO could integrate into ongoing construction operations and respond to the demands of a dynamic site environment. The robot’s consistent application, reduced waste, and autonomy in operation aligned with A.Yoshii’s goals are to adopt more innovative and more scalable construction technologies.

MYRO’s core performance metrics illustrated clear gains in productivity and material efficiency-key considerations for project-driven environments. The deployment demonstrated how automation can fill critical labour gaps while ensuring precision and speed on-site.

Working with A.Yoshii-a respected name in Brazilian construction-was a strategic milestone for MYRO. The engagement facilitated technical validation in a new regional context and paved the way for more in-depth discussions about robotics as a long-term investment for enhancing efficiency and driving growth.

By proving its value through data-backed performance, MYRO continued to reinforce its role in reshaping modern construction practices, bringing more innovative tools to projects that demand both speed and quality.

Glimpses of the Project:

Glimpse 1
Glimpse 2
Glimpse 3
Glimpse 4
Glimpse 5
Glimpse 6
Company Logo

Singapore Headquarters

111 North Bridge Road
#07-11 Peninsula Plaza Singapore (179098)

Dubai Branch

7, 599- Jebel Ali Industrial First
Dubai, UAE- 507187

Contact Number: +971 54 995 4416
Email [email protected]


© All Rights Reserved MYRO International PTE 2026